Case study · home renovations & extensions · northern Adelaide

ASP Build & Co: page one on Google in its own corridor.

A renovation and extension builder in Adelaide’s north. It took 8 website enquiries and calls in October 2026, after none in September, Google clicks went from 40 to 67, and it averages position 1.9 on Google for “renovations munno para” (Search Console, 1 – 30 Oct 2026).

The ASP Build & Co website, as it is live today
Client
ASP Build & Co, licensed builder (BLD 360698)
Area
Munno Para, Riverlea Park, Elizabeth, Angle Vale, Two Wells, Gawler
Work
Website by JB Digital Barossa, area pages for the north corridor, Business Profile
Data
Live Google checks 5 and 25 Oct 2026; Search Console to 30 Oct 2026; website enquiries, October 2026

Before, the work and after

Before mid-2026

A builder with good work and few online signals: a handful of reviews, little project proof on the web, and a site that was aiming at Adelaide-wide head terms it sat on page six to nine for.

The work

  • A page for each area in the north corridor the business actually builds in, instead of chasing metro-wide terms (for example, ASP’s renovations page for Munno Para).
  • Google Business Profile set up with the right category, services and service area.
  • Search Console connected; the area pages nearest page one (Elizabeth, Two Wells, Angle Vale, Gawler) are the next push.

After

Search Console · 1 – 30 Oct 2026

  • “renovations munno para”: Search Console average 1.9, and “renovations elizabeth” 1.8 (1 – 30 Oct 2026), up from 3.2 for “renovations munno para” in 6 Sep – 3 Oct.
  • “bathroom renovations elizabeth”: average 4.9 (1 – 30 Oct 2026), up from 15.9 in September.
  • Google clicks 40 → 67, times shown 1,625 → 19,808 (1 – 30 Sep vs 1 – 30 Oct 2026).

Website enquiries · October 2026

  • 8 website enquiries and calls in October 2026: 5 quote requests through the form, 2 calls and 1 email tap, counted one by one from our form records.

Live Google checks · 5 and 25 Oct 2026

  • “home renovations”: #1 on Google Maps around Riverlea Park in a live check on 5 Oct 2026; not in the results when re-checked on 25 Oct 2026.

The honest bits

What the numbers don’t say.

Visibility is still ahead of enquiries. 8 website enquiries and calls in October 2026 is a start, not a full diary. The corridor pages are climbing, but the metro-wide terms the site was first aimed at mostly sit at positions 61 to 92 (Search Console, 24 Sep – 21 Oct 2026), and that is where most of the searches are.
Four Google reviews. Reviews and real project photos are what will move the map pack. That is the next job, and it depends on the owner as much as on us.
A live check from one town. The #1 Maps result around Riverlea Park was a single check on 5 October 2026 (mobile, logged out); re-checked on 25 October 2026 it was not in the results. Results vary by location and day.

Ready when you are

Building in the north?

Area pages for the suburbs you actually build in beat chasing all of Adelaide. Start with a free audit.